Leader in Engineering and Industrial Construction
Project Highlights | |||
---|---|---|---|
Client | ABG Star Cement Company LLC RAK - UAE | ||
Plant and Machinery Supply | FLSmidth India, FLSmidth Airtech, LOESCHE, LNV Technology and MANN-SIEMENS | ||
Consultants | ERCOM Chennai, Bhagati Designes (P) Ltd (FLS Designes), Mumbai and Aquatherm Engg. | ||
Description of work | Civil Construction, Fabrication, Painting & Erection of Structural Steel, Plate work and Equpment Erection for 6500 TPD Clinker Plant and Captive Powre Plant. | ||
Time Schedule | 24 Months | ||
Period | 2007-2009 |
Scope of Works | Brief Description of the Project | |
---|---|---|
Earth Work Excavation | 61,000 m^3 | Location of Plant: Adjacent to Emirates Cement plant at Ras Al Khaimah, UAE. |
Back Filling | 20,000 m^3 | |
Reinforcement | 6,500 MT | The Preheater Building is an RCC structure of 110 meter height with 8 floors. |
Formwork | 120,0000 m^2 | |
Slipform Works | 20,000 m^2 | Fabrication of Preheater cyclones and raw mill ducts at site. |
Concrete Works | 51,000 m^3 | |
Fabrication & Painting | 6,7000 MT | Erection of Structures and equipment upto a height of 145 Meters |
Erection | 14,500 MT | |
Refractory | 4,500 MT |
The Preheater Building is an RCC structure of 110 meter height with 8 floors.
Fabrication of Preheater cyclones and raw mill ducts at site.
Erection of Structures and equipment upto a height of 145 Meters
Location of Plant: Adjacent to Emirates Cement plant at Ras Al Khaimah, UAE.